Targets: 24 hours runtime at full house load with no generation online; prefer distributed banks with cross-wiring/failover; prefer subpanels per hull and salon.
Architecture notes
Distributed banks reduce single-point-of-failure but increase integration complexity.
Cross-wiring needs clear isolation rules and labeled switching to avoid cascading failures.
IT power should be modular and fail-safe (nonessential loads shed automatically).